Kars Airport MV/LV SCADA and IEC 61850 Integration Project

A SCADA system built to monitor and control the medium and low voltage side of the airport electrical distribution system from a single centre. Protection relays in the regulator building and the transformer substations are collected over IEC 61850, and the data is transferred to Citect SCADA using IEC 60870-5-104.

13protection relays
7node fibre ring
<50 msring recovery

Scope of work

  • Integration of 8 Schneider P3U30 MV protection relays in the regulator building
  • Integration of P3U30 relays in 5 transformer substations
  • WAGO PFC300 RTU configuration and protocol conversion
  • Commissioning of IEC 61850 MMS and GOOSE communication
  • IEC 60870-5-104 integration with Citect SCADA 7.3
  • Design and installation of a 7-node fibre ring backbone
  • Copper ring access layer

Technical solution

Why IEC 61850

Collecting protection relays over IEC 61850 rather than classic serial protocols gives both a standard data model and the ability to build fast interlocking and blocking functions through GOOSE messaging between relays. In an outage-sensitive facility such as an airport, this means protection coordination runs independently of the SCADA.

Protocol conversion

Data collected on the field side over IEC 61850 MMS/GOOSE is converted to IEC 60870-5-104 on the WAGO PFC300 RTU and passed to Citect SCADA. This two-layer structure separates the field protocol from the control-centre protocol, so the field infrastructure survives even if the SCADA software is later replaced.

Fibre ring redundancy

The backbone is built on a fibre ring of 7 nodes. With the ERPS (G.8032) ring protection protocol, communication is re-established in under 50 milliseconds when a fibre is cut. A copper ring is also provided at the access layer, so a single cable fault does not stop the whole monitoring system.

Citect SCADA 7.3

The control centre displays MV/LV single line diagrams, cubicle states, protection relay data and energy values. Event and alarm records are time-stamped, allowing post-fault analysis to be carried out on those records.

Outcome

The medium and low voltage side of the airport electrical infrastructure is being brought under single-centre monitoring over a redundant communication backbone. The project is currently in progress.

SYSTEM ARCHITECTURE

How data travels from the field to the control centre

FIELD — PROTECTION RELAYS Regulator building 8 × P3U30 Transformer substations (5) 5 × P3U30 IEC 61850 MMS / GOOSE PROTOCOL CONVERSION WAGO PFC300 RTU IEC 61850 → IEC 60870-5-104 IEC 60870-5-104 CONTROL CENTRE Citect SCADA 7.3 MV/LV single line, alarm and event log COMMUNICATION BACKBONE 7-node fibre ring · ERPS (G.8032) · <50 ms recovery · copper ring access