İDY Mühendislik TR Request a Quote

Home / Projects

Reference projects

Listed below, in separate sections, are both the projects completed within our company and those carried out by the company owner during previous employment. Work experience certificates and project files are available on request.

39Documented projectsIrrigation, potable water, energy and industry
5Airport MV SCADA systemsKars, Gaziantep, Diyarbakır, Şırnak, Hakkâri
9Hydro / wind plant systemsTurbine control, cubicle monitoring and plant SCADA
120+Remotely monitored wellsTelemetry from a single control centre
SELECTED PROJECTS

Four featured projects

With scope, site photographs and the SCADA screens we developed.

Konya Ereğli İvriz Left Bank Irrigation Project

Kolin İnşaat · 2024

Irrigation Automation

SCADA system for an irrigation scheme comprising 60 deep wells, one pumping station and two collection reservoirs. With wellhead RTUs, map-based monitoring, trending and alarm management, the entire scheme is operated from a single control centre.

60wells
1pumping station
2collection reservoirs
Live status of operating wells on the map view
Live status of operating wells on the map view
Pumping station mimic screen
Pumping station mimic screen
Series production of wellhead automation panels
Series production of wellhead automation panels
Wellhead kiosk installation and commissioning
Wellhead kiosk installation and commissioning
Wellhead RF telemetry antenna and control kiosk
Wellhead RF telemetry antenna and control kiosk
RF telemetry link across the irrigation area
RF telemetry link across the irrigation area
Well panel — drive and protection assembly
Well panel — drive and protection assembly
Flow and level trend screen
Flow and level trend screen

ASKİ — Automation Panels for 12 Pumping Stations

ASKİ / Mekatronik İnşaat · 2023

Pumping Stations

Manufacture, site installation and central SCADA integration of automation panels for 12 pumping stations operated by the Ankara Water and Sewerage Administration. Integration with the existing ASKİ SCADA infrastructure was achieved using Motorola ACE3600 RTUs.

12pumping stations
ACE3600RTU
MCCpanel manufacture
Booster station pump hall
Booster station pump hall
Pump set and discharge manifold
Pump set and discharge manifold
Pump and motorised valve assembly
Pump and motorised valve assembly
Station MCC panel
Station MCC panel
Internal panel layout and wiring
Internal panel layout and wiring
Panel single-line drawing and layout plan
Panel single-line drawing and layout plan

Yamula Downstream Irrigation Union — Panel Refurbishment

Yamula Downstream Irrigation Union · 2022

Modernisation

Refurbishment of the existing automation systems at two irrigation pumping stations to current standards. Panel manufacture, software and commissioning were completed under single-contractor responsibility.

2pumping stations
IEC 61439panel standard
Refurbished pumping station and drive panels
Refurbished pumping station and drive panels
New automation panel — internal layout
New automation panel — internal layout
Field control panel with operator terminal
Field control panel with operator terminal

Barajyol İnşaat — Cement Plant Automation

Barajyol İnşaat Madencilik · 2022

Process Automation

Full PLC/SCADA automation of the dosing, mixing and discharge systems at a cement plant. Recipe-based production, weighbridge integration and batch reporting were implemented.

Recipebased production
Batchreporting
Cement dosing unit mimic screen
Cement dosing unit mimic screen
Recipe definition and batch setting screen
Recipe definition and batch setting screen
Plant automation panel
Plant automation panel
Internal panel layout and wiring
Internal panel layout and wiring
Site — belt conveyor and dosing line
Site — belt conveyor and dosing line
General view of the plant site
General view of the plant site
FULL LIST

Project list

39 projects in total. Section A was delivered within our company; Section B was carried out by the company owner during previous employment.

Projects delivered by İDY Mühendislik

Projects carried out and completed directly by our company.

A.1 Irrigation Projects

  • A-01

    Konya Ereğli İvriz Left Bank Irrigation Project

    Irrigation SCADA for 60 wells, one pumping station and two collection reservoirs

  • A-02

    ASKİ — Automation Panels for 12 Pumping Stations

    Automation of 12 pumping stations and integration into the central SCADA system

  • A-03

    Yamula Downstream Irrigation Union — Pumping Station Panel Refurbishment

    Refurbishment of the automation systems at two irrigation pumping stations

  • A-04

    Bursa Yenişehir Groundwater Irrigation and Drainage Network — Deep Well SCADA

    SCADA for an irrigation scheme of 54 wells and 4 reservoirs

A.2 Plant and Facility Automation Projects

  • A-05

    Barajyol İnşaat — Cement Plant Automation Project

    Cement plant automation system

A.3 Airport MV SCADA Projects

  • A-06

    Kars Airport MV/LV SCADA ProjectIn progress

    MV/LV monitoring and control system based on Citect SCADA 7.3. Eight Schneider P3U30 MV protection relays in the regulator building and P3U30 relays in five transformer kiosks are collected over WAGO PFC300 RTUs using IEC 61850 MMS/GOOSE and transferred to Citect SCADA over IEC 60870-5-104. Seven-node fibre ring backbone (ERPS/G.8032, <50 ms recovery) with a copper ring access layer.

Projects delivered in previous engagements

Projects completed by the company owner during previous employment at Foks Otomasyon and SYS Sistem Otomasyon.

B.1 Airport MV SCADA Projects · Foks Otomasyon

  • B-01

    Diyarbakır Airport New Terminal Building MV SCADA Project

    Integration of six 31.5 kV and twenty-three 6.3 kV MV cubicles into ABB MicroSCADA via RTU560 series units. Communication with MV power analysers, GPS time synchronisation and interface to the generator synchronisation system.

  • B-02

    Şırnak Airport MV SCADA Project

    Integration of the 31.5 kV power centre cubicles, the 6.3 kV power centre and the H1 regulator centre cubicles into a redundant ABB MicroSCADA via RTU560 series units.

  • B-03

    Hakkâri Airport MV SCADA Project

    Monitoring and control of the 31.5 kV and 6.3 kV power centre cubicles through a redundant ABB MicroSCADA via RTU560 series units.

  • B-04

    Gaziantep Airport MV SCADA Project

    Monitoring and control of eleven 31.5 kV and sixty-four 6.3 kV MV cubicles (TM, TR, H1, SANTAY and OPET areas) through a redundant ABB MicroSCADA via RTU560 series units. All protection relays were synchronised to GPS time.

B.2 Energy and Automation Projects · Foks Otomasyon

  • B-05

    Finansbank Energy Automation

    Energy monitoring, load shedding and load restoration automation

  • B-06

    Diyarbakır 400-Bed Research and Training Hospital Energy Automation

    Energy monitoring, load shedding and load restoration automation

  • B-07

    Constitutional Court New Campus Energy Automation and SCADA

    Energy monitoring, load shedding and load restoration automation

  • B-08

    MNG Aircraft Maintenance Hangar Energy Automation

    Energy monitoring and load shedding automation with LV breaker and analyser monitoring

  • B-09

    TPAO Energy Monitoring SCADA System

    Energy monitoring, load shedding and load restoration automation

  • B-10

    Bingöl State Hospital Energy SCADA Automation

    Energy monitoring, load shedding and load restoration automation

B.3 Hydroelectric and Wind Power Projects · Foks Otomasyon

  • B-11

    Pınar HPP SCADA and Automation

    Automation of three 30 MVA Francis turbine units, distribution centre monitoring of 12 cubicles over Modbus, and plant SCADA

  • B-12

    Rıza HPP SCADA Automation

    Automation of three 15 MVA Francis turbine units and distribution centre monitoring of 12 cubicles over Modbus

  • B-13

    Kutay 1 HPP SCADA Automation

    Hydroelectric plant SCADA including cubicle monitoring and control

  • B-14

    Kutay 2 HPP SCADA Automation

    Hydroelectric plant SCADA including cubicle monitoring and control

  • B-15

    Can 1 HPP Automation

    Automation of two 1.8 MVA Francis turbine units and distribution centre monitoring of 6 cubicles over Modbus

  • B-16

    Bekdemür HPP Automation

    Automation of two 1.8 MVA Francis turbine units and distribution centre monitoring of 6 cubicles over Modbus

  • B-17

    Yeşilırmak HPP Automation

    Automation of three 14.25 MW Francis turbine units and distribution centre monitoring of 10 cubicles over Modbus

  • B-18

    Yaprak HPP Unit 4 SCADA Automation

    Hydroelectric plant SCADA including cubicle monitoring and control

  • B-19

    Şenbuk WPP MV Energy Monitoring and Control Automation

    Monitoring SCADA for 33 MV ring main units and for the MV switchyard

B.4 Substation and Switchyard Projects · Foks Otomasyon

  • B-20

    Melen Substation RTU/SCADA

    15.4 kV switchyard monitoring SCADA

  • B-21

    Cumhuriyet Substation RTU/SCADA System

    15.4 kV switchyard monitoring SCADA

  • B-22

    Şırnak Airport Energy RTU/SCADA

    Modbus communication with 18 IEDs (SEPAM relays), distribution centre monitoring and MV switchyard monitoring SCADA

  • B-23

    Turkmenistan Substation RTU/SCADAInternational

    MV switchyard monitoring SCADA

B.5 Organised Industrial Zone Project · SYS Sistem Otomasyon

  • B-24

    Demirtaş OIZ SCADA, Metering Automation, Communications and CCTVTwo-year site assignment

    SCADA for twelve 34.5 kV distribution centres over an IEC 61850 GOOSE fibre ring. Fibre ring communication with Siemens Siprotec IED relays at 11 distribution centres (DC1–DC12, 214 cubicles in total). Electricity, water, wastewater and natural gas metering automation with billing. A 53-camera pole-mounted CCTV system. Booster station and reservoir process automation.

B.6 Irrigation and Potable Water Projects

  • B-25

    Lower Seyhan Yedigöze İmamoğlu Irrigation Scheme — Stage 1

    İmamoğlu irrigation automation and scheme SCADA

  • B-26

    Tekeli (Mersin) Potable Water Electrical, Instrumentation and Automation Works

    Potable water system SCADA

B.7 Transmission Main and Pumping Station Projects

  • B-27

    Karasakızlık New Transmission Main — Electrical, Automation, Instrumentation and SCADA

    Transmission main process SCADA

  • B-28

    Çankırı Stage III Water Transmission Main — Electrical, Instrumentation, Automation and SCADA

    Transmission main process SCADA

  • B-29

    Kral Kızı Pumping Station Automation

    Motor control SCADA for eight 1 kV motors with resistance and soft starter starting

  • B-30

    Suruç Pumping Station Automation

    Control of eight 5 MW vertical shaft pumps, monitoring of a six-cubicle distribution centre, and process and energy automation SCADA for the pumping station

B.8 Plant and Facility Automation Projects

  • B-31

    Kosovo Ready-Mix Plaster Plant Instrumentation, Automation and SCADAInternational

    Ready-mix plaster process automation

  • B-32

    State Planning Organisation Biogas Production Data Acquisition and SCADA — Pilot Plant

    SCADA for the Ege University laboratory biogas production facility

  • B-33

    Gazipaşa Wastewater Treatment Plant Electrical, Instrumentation and Automation Works

    Treatment process SCADA

Send us your specification and we will prepare your quotation

A bill of quantities, a single-line diagram or a technical specification is enough. We will review the scope and return a priced proposal.